How much does an electrician cost in Los Angeles? Based on BLS OEWS May 2024 wage data and RSMeans 2024 construction costs, here are real numbers — not the "$99–$975" ranges you get from lead-gen sites.
LA seismic requirements affect panel mounting. LADBS permits are notoriously slow — budget 3-6 weeks for permit processing.
Every price below is adjusted to Los Angeles's labor market using a 1.22× city index applied to RSMeans 2024 national data. Labor hours assume standard conditions — add 15–40% for older homes, difficult access, or code catch-up.
| Job | Price Range | Hours | Permit |
|---|---|---|---|
|
GFCI Outlet Install
NEC 210.8: Required within 6ft of any sink. Protects all downstream outlets on same circuit.
|
$92–$305 | 1h | No |
|
AFCI Breaker Upgrade (per circuit)
NEC 210.12 (2020): AFCI required for all 15/20A branch circuits in living areas.
|
$92–$244 | 1h | Required |
|
Tamper-Resistant Outlets (per room)
NEC 406.12 (2008): Required at all 15/20A receptacles in all rooms (not just kitchens/baths).
|
$122–$366 | 1h | No |
|
Ceiling Fan Replace (existing box)
Verify existing box has "Acceptable for Fan Support" stamp before installing.
|
$122–$549 | 1.5h | No |
|
Outdoor GFCI Outlets (×2)
Must be in weatherproof in-use cover (NEC 406.9). WR+GFCI device required.
|
$244–$732 | 2h | No |
|
New 20A Dedicated Circuit
Dishwashers, microwaves, refrigerators, washers all require dedicated 20A circuits.
|
$305–$915 | 3h | Required |
|
Smoke/CO Detectors - Hardwired (×4)
Interconnected required in new construction. Battery backup required on all.
|
$366–$976 | 3h | No |
|
New 240V Circuit (30-50A)
For dryers (30A), ranges (50A), HVAC (varies). Run 10/3 or 6/3 Romex.
|
$427–$1,342 | 4h | Required |
|
Ceiling Fan + New Box + Circuit
Fan-rated box required (NEC 314.27). Standard round boxes cannot support fan load.
|
$427–$1,098 | 3.5h | No |
|
Meter Socket Replacement
Utility owns the meter, homeowner owns the socket. Get utility approval first.
|
$488–$1,464 | 4h | Required |
|
Recessed Lights Install (×4)
IC-rated can required in insulated ceilings. LED retrofit is 15-min vs full can replacement.
|
$488–$1,464 | 4h | No |
|
Generator Transfer Switch (manual)
Interlock kit vs manual transfer switch - never backfeed utility (NEC 702).
|
$488–$1,464 | 4h | Required |
|
Service Entrance Cable Replace
Damaged SE cable is a critical fire/shock hazard. Utility must disconnect.
|
$732–$2,440 | 5h | Required |
|
EV Charger Level 2 Hardwired
Panel proximity = biggest cost variable. 50ft run vs 5ft = $300-600 wire cost difference.
|
$854–$2,318 | 4.5h | Required |
|
Subpanel Install (100A)
Must be properly grounded and bonded. Cannot bond neutral to ground at subpanel (NEC 250.142).
|
$976–$2,684 | 6h | Required |
|
Aluminum Branch Wiring Remediation
Options: full rewire (safest), CO/ALR at every device, AlumiConn at every junction.
|
$1,220–$4,880 | 10h | Required |
|
Panel Upgrade 60A→100A
60A fuse boxes are a home insurance red flag. Utility coordination required.
|
$1,464–$3,660 | 7h | Required |
|
K&T Partial Update (1 circuit)
Partial is often false economy - connected circuits still ungrounded.
|
$1,830–$4,880 | 12h | Required |
|
Solar Inverter Replacement
Microinverter vs string inverter - different replacement process entirely.
|
$1,830–$4,880 | 6h | Required |
|
Panel Replace - Pushmatic
Pushmatic panels: Bulldog brand, button-style breakers, no trip test capability.
|
$2,196–$4,880 | 9h | Required |
|
Panel Upgrade 100A→200A
Utility shutoff adds 1-3 day delay. Load calculation required. Inspector same day.
|
$2,196–$5,124 | 8h | Required |
|
Panel Replace - Zinsco/Sylvania
Zinsco breakers bond to bus bar, fail to trip while appearing OFF. Same danger as FPE.
|
$2,440–$5,490 | 9h | Required |
|
Panel Replace - FPE Stab-Lok
FPE Stab-Lok: 25-65% breaker failure rate (IEEE). Most insurers now require disclosure or replacement.
|
$2,684–$6,100 | 10h | Required |
|
Panel Upgrade 200A→400A
Required for large homes with EV charging, whole-home generators, electric heating.
|
$4,270–$9,760 | 12h | Required |
|
Standby Generator Install (whole-home)
Gas line, automatic transfer switch, utility coordination, concrete pad all required.
|
$9,760–$24,400 | 20h | Required |
|
Whole Home Rewire
NECA: 100-160 hrs for 1,500 sqft. Drywall patching = 30-40% of total cost.
|
$14,640–$42,700 | 140h | Required |
|
Knob & Tube Full Rewire
Cannot insulate over K&T (NEC 394.12). Every circuit requires complete conductor replacement.
|
$18,300–$54,900 | 160h | Required |
Prices: RSMeans 2024 × 1.22 (Los Angeles index). Labor: BLS OEWS May 2024. Code: NEC 2023 (National Electrical Code). Required for all panel work, new circuits, and service upgrades in every US jurisdiction.
Upload a photo. Five AI agents identify the problem, check code violations, price it with Los Angeles's actual labor rates, and tell you exactly what to ask the contractor.
Free Electrical Estimate →